28,000 sq ft in Eugene, Oregon

Your machine is built by hand in this building and racked a few metres away. One roof: assembly, burn-in, and the racks it runs in, on a grid that is roughly 90% carbon-free.

The facility

DetailFigure
28,000 square feetBuild floor, burn-in benches and racks under one roof in Eugene.
~90% carbon-free gridOregon's hydro-heavy grid, which is why the machines live here.
N+1 redundant powerPower and cooling sized so a single failure is not an outage.
24/7 on-site engineeringPeople in the building, not a ticket queue in another timezone.

Built here, then racked here

Built here, by hand

Parts land in Eugene and your machine is assembled in this building, not drop-shipped from a contract manufacturer. Typical lead time is 6–8 weeks from order.

QC and a 48-hour burn-in

Every build is stress-tested before it is racked. That, plus the warranty reserve, is what the single 5% Build & AI-Guarantee fee on your quote pays for.

Racked, and yours

The machine moves a few metres from the bench to the rack. You own it outright; we operate it. Have it shipped to you whenever you want it instead.

What we do for the machine

You own the hardware outright. Everything below is what Managed Hosting pays for. On a machine that earns it is netted from your share rather than invoiced:

Eugene, Oregon. The building has its own site: 80ndanebo.com

Browse machines · Book a call